Expert Review types |
2007-2009 | 2010-2014 |
2015-2020 |
Main State Expert Review |
5 | 13 | 16 |
Industrial safety expert review |
1 | 12 | 29 |
State Environmental Expert Review |
- | 7 | 3 |
Sanitary and Epidemiological Expert Review |
4 | 5 | 1 |
Federal Fishery Agency Expert Review |
1 | 2 | 5 |
Metrological Expert Review |
- | - | 1 |
Energy Efficiency Expert Review |
- | - | 2 |
Water Resources Conservation Expert Review |
2 | 1 | - |
Overall: |
13 | 40 | 57 |
Total: |
110 |
100% |
ONHP Project Design Documentation obtained 100% positive conclusions of Expert Review in Russian Federation, the Republic of Kazakhstan and the Republic of Serbia. |
ONHP REFERENCES
REFERENCES IN PUBLIC HEARING ARRANGEMENT AND IMPLEMENTATION
Russian Federation.
Environment Impact Assessment Public Hearings for “JSC Novoshakhtinsk Refinery 3rd train Construction. Diesel Fuel Hydrotreatment Complex. Sulphur Recovery Unit” Contract with JSC NZNP Engineering, 2020.
The Republic of Kazakhstan
Pre-EIA Public Hearings for “Tire Production Management in the Republic of Kazakhstan” Contract with KamaTyresKZ, 2020.
Public Hearing Arrangement and Implementation Services provided by ONHP:
- - harmonize terms and location of Public Hearings with Client
- - inform society about Public Hearings, publish announcements in mass media
- - prepare and arrange EIA data (incl. the specialist availability for consultation in public reception office, public awareness assurance)
- - receive comments and proposals from the public
- - prepare presentations for Public Hearings
- - conduct public hearings, present the information, conduct Q&A sessions
Documentation approval in special authorized bodies:
- - Federal Agency for Fisheries;
- - Federal Air Transport Agency;
- - Russian Federal State Agency for Health and Consumer Rights etc;
STATE ENVIRONMENTAL EXPERT REVIEW
Since 2010 till now ONHP has received over 10 positive conclusions.
RUSSIAN FEDERATION |
REPUBLIC OF KAZAKHSTAN ![]() |
REPUBLIC OF SERBIA |
---|---|---|
NK Rosneft JSC Far-East Petrochemical Company (ZAO VNHK) Gazprom Neft Shelf |
Kazakhstan Petrochemical Industries Inc. Aktau Plastics Plant Positive Review Result was obtained. Aktau Plastics Plant Aromatic Hydrocarbons Construction Complex (Phase ll) at Atyrau Refinery. |
NIS Petroleum Industry of Serbia |
SANITARY PROTECTION ZONE (SPZ) |
NK Rosneft.
Project Design Documentation Development for Far-East Petrochemical Company facilities with capacity up to 10 MTA. Phase 1. Sanitary protection zone project development.
Sanitary & Epidemiological Conclusion was obtained.
Capital Construction Department, Omsk.
SPZ project development for 8 main companies of north-western Omsk industrial hub.
Positive Review Result was obtained.
ZAO Dromass
SPZ for Dromass
Positive Review Result was obtained.
DCC complex at Atyrau Refinery
EIA development. SPZ development
Positive Review Result was obtained.
WASTES GENERATION AND DISPOSAL LIMITS BOOK |
Gazpromneft ONPZ JSC
Wastes Generation and Disposal Limits Book.
Approval document was obtained.
MAXIMUM PERMISSIBLE EMISSION (MPE) |
Gazpromneft ONPZ JSC
Draft standards for atmospheric pollutants maximum permissible emissions.
Approval document was obtained.
ZAO Dromass
Draft standards for atmospheric pollutants maximum permissible emissions.
Approval document was obtained.