Expert Review

Expert Review types

2007-2009 2010-2014

2015-2020

Main State Expert Review 

5 13 16

Industrial safety expert review 

1 12 29

State Environmental Expert Review

- 7 3

Sanitary and Epidemiological Expert Review

4 5 1

Federal Fishery Agency Expert Review

1 2 5

Metrological Expert Review

- - 1

Energy Efficiency Expert Review 

- - 2

Water Resources Conservation Expert Review

2 1 -

Overall:

13 40 57

Total:

110
100%

ONHP Project Design Documentation obtained 100% positive conclusions of Expert Review in Russian Federation, the Republic of Kazakhstan and the Republic of Serbia.

ONHP REFERENCES

REFERENCES IN PUBLIC HEARING ARRANGEMENT AND IMPLEMENTATION


Russian Federation.

Environment Impact Assessment Public Hearings for “JSC Novoshakhtinsk Refinery 3rd train Construction. Diesel Fuel Hydrotreatment Complex. Sulphur Recovery Unit” Contract with JSC NZNP Engineering, 2020.


The Republic of Kazakhstan

Pre-EIA Public Hearings for “Tire Production Management in the Republic of Kazakhstan” Contract with KamaTyresKZ, 2020.


Public Hearing Arrangement and Implementation Services provided by ONHP:

  • -   harmonize terms and location of Public Hearings with Client
  • -   inform society about Public Hearings, publish announcements in mass media
  • -   prepare and arrange EIA data (incl. the specialist availability for consultation in public reception office, public awareness assurance)
  • -   receive comments and proposals from the public
  • -   prepare presentations for Public Hearings
  • -   conduct public hearings, present the information, conduct Q&A sessions

Documentation approval in special authorized bodies:

  • -   Federal Agency for Fisheries;
  • -   Federal Air Transport Agency;
  • -   Russian Federal State Agency for Health and Consumer Rights etc;

 

STATE ENVIRONMENTAL EXPERT REVIEW

Since 2010 till now ONHP has received over 10 positive conclusions.

RUSSIAN FEDERATION

REPUBLIC OF KAZAKHSTAN

REPUBLIC OF SERBIA

NK Rosneft JSC
Project Design Documentation Development for Primorsk Refinery with capacity over 20 MTA.
Positive Review Result was obtained.

Far-East Petrochemical Company (ZAO VNHK)
Project Design Documentation Development for ZAO VNHK with capacity up to 10 MTA for feedstock.
Phase 1. Positive Review Result was obtained.

Gazprom Neft Shelf
Technical re-equipment for Offshore Ice-Resistant Stationary Platform.
Positive Review Result was obtained.

Kazakhstan  Petrochemical Industries  Inc.
Integrated Gas Chemical Complex Construction, Atyrau.
Positive Review Result was obtained.

Aktau Plastics Plant
Development and Production Diversification Strategy.

Positive Review Result was obtained.

Aktau Plastics Plant
DCC complex at Atyrau Refinery.
Positive Review Result was obtained.

Aromatic Hydrocarbons Construction Complex (Phase ll) at Atyrau Refinery.
Positive Review Result was obtained.

NIS Petroleum Industry of Serbia
Designed Units connection to existing Panchevo Refinery facilities
Positive Review Result was obtained.

 

SANITARY PROTECTION ZONE (SPZ)

NK Rosneft.
Project Design Documentation Development for Far-East Petrochemical Company facilities with capacity up to 10 MTA. Phase 1. Sanitary protection zone project development.
Sanitary & Epidemiological Conclusion was obtained.

Capital Construction Department, Omsk.
SPZ project development for 8 main companies of north-western Omsk industrial hub.
Positive Review Result was obtained.

ZAO Dromass
SPZ for Dromass
Positive Review Result was obtained.

DCC complex at Atyrau Refinery
EIA development. SPZ development
Positive Review Result was obtained.

 

WASTES GENERATION AND DISPOSAL LIMITS BOOK

Gazpromneft ONPZ JSC
Wastes Generation and Disposal Limits Book.
Approval document was obtained.

 

MAXIMUM PERMISSIBLE EMISSION (MPE)

Gazpromneft ONPZ JSC
Draft standards for atmospheric pollutants maximum permissible emissions.
Approval document was obtained.

 

ZAO Dromass
Draft standards for atmospheric pollutants maximum permissible emissions.
Approval document was obtained.

 

English